The development of a 15 MTPA  (maximum 19 MTPA) Bulk aggregate handling terminal in  Phase 1, at the existing Dibba Port at Dibba, Fujairah. materials to be transported and exported  includes Limestone, Gabbro and clinker.

Scope of Work
Tender Design Scope - Package 3A
  • Design of coast guard breakwater
  • Design of fishing harbour BW ‚Äì 2 options
  • Design of new reclamation revetment
Tender Design Scope - Package 3B
  • Design of Main berth Quay wall for two options of blocks work quay wall as base option and an alternative option
  • Design of Tug berth Quay wall for two options of blocks work quay wall as base option and an alternative option
  • Design of Ship Loader land side foundation
  • Design of main breakwater extension
  • Design of crest wall